This idea has been archived, contributions have been disabled 

Comments (17)

Ulf Westerberg
Ulf Westerberg

Ulf Westerberg

Level
0
Score
0

Splendid suggestion

Michael Schneider
Michael Schneider

Michael Schneider

Level
0
Score
0

Have wanted this for a long time

Carl Barck
Carl Barck

Carl Barck

Level
0
Score
0

very good idea, will give us a better function when following up our projects

Karolina Jackson-Ward
Karolina Jackson-Ward

Karolina Jackson-Ward

Level
0
Score
41
Team

Would you like to have Issues that a person is assigned included in the time reporting tool in Projectplace?

Or a separate function for this?

Anonymous
Anonymous

Anonymous

Level
0
Score
0

I prefer a specific field, directly within the issue, as easy to reach as adding the estimated time. I will add a picture suggesting where.

Ian von Essen
Ian von Essen

Ian von Essen

Level
0
Score
72

Sorry, forgot to login. I prefer a specific field, directly within the issue, as easy to reach as adding the estimated time. I will add a picture suggesting where.

The top ideas with status Quality Backlog are discussed on a regular basis with the design team. These should be minor development, and could include hygiene factors, little things that create a wow effect and ideas that could have a positive effect on a lot of users.

Anonymous
Anonymous

Anonymous

Level
0
Score
0

Tests

Thomas Texter
Thomas Texter

Thomas Texter

Level
0
Score
0

we are using issues quite a lot. However, the lack of time tracking is a major issue for us.
Since assignments to an issue can change imo it would be necessary to add "spent time" field to each comment (per user). Also it would be useful to link the issue to a project task.

Karolina Jackson-Ward
Karolina Jackson-Ward

Karolina Jackson-Ward

Level
0
Score
41
Team

Question for crystallizing Your goal
Why do you want to do a follow up?

Questions for crystallizing Your needs
What do you want to follow up on?
Who is supposed to do the time reporting for an Issue?
When do you do a follow up?

Anonymous
Anonymous

Anonymous

Level
0
Score
0

While tasks are good for planned work we use issues for unplanned work though lack the ability to report time spent for assigned members in the time-reporting section, maybe it could go there instead of in the issue section becuse then you get the time spent "by who" correctly

With only one comment we feel like this could be moved back to the backlog. We are in the process of investigating how we should support collaborative planning and tracking of project work. This is something that will be brought up under the umbrella of that pre study.