We are continually improving our user interface to make it work well. Right now we don´t have any specific plans for resizing columns but instead we are right now working on getting an overall view of areas that we want to improve and where this might be something we also think should be prioritized.

Comments (9)

Finn Backer
Finn Backer

Finn Backer

Level
0
Score
0

Yes, this would be great. Just the ability to change column width would be helpful. I can not read the description column, while oter coul,mn is emtpy.

Karolina Jackson-Ward
Karolina Jackson-Ward

Karolina Jackson-Ward

Level
0
Score
41
Team

The top ideas with status Quality Backlog are discussed on a regular basis with the design team. These should be minor development, and could include hygiene factors, little things that create a wow effect and ideas that could have a positive effect on a lot of users.

Karolina Jackson-Ward
Karolina Jackson-Ward

Karolina Jackson-Ward

Level
0
Score
41
Team

We would like to make the user interface easier to customise. We will look into how difficult it would be to make it possible to change column size.

Anonymous
Anonymous

Anonymous

Level
0
Score
0

This is still a problem. The discription column is not wide enough to read the entire description for all our drawings.
The best option would be to be able to change column width for all columns.

Silvija Doncev
Silvija Doncev

Silvija Doncev

Level
0
Score
0
Team

We are continually improving our user interface to make it work well. Right now we don´t have any specific plans for resizing columns but instead we are right now working on getting an overall view of areas that we want to improve and where this might be something we also think should be prioritized.

Pls allow owner of the activity to be displayed in Plan view (now owner can only be seen when owner is assigned to a card in a Board) - most project management tool would have that option as it should be natural to also see owner when reviewing schedule in the Plan view.